Recent Projects
JOB: | Middle Street |
CLIENT: | KD Contractors |
DESCRIPTION: | 124 Bed student accommodation close to the University of Portsmouth. |
JOB: | ST James Street |
CLIENT: | PMC Construction |
DESCRIPTION: | 35 bed student accommodation close to the University of Portsmouth featuring LED lighting and energy efficient electric panel heaters. |
JOB: | Copnor Green Housing Development |
CLIENT: | PMC Construction |
DESCRIPTION: | Mixed housing development in Portsmouth for a local housing association designed to stringent energy-efficient criteria, incorporating photovoltaic solar panels, heat recovery ventilation systems, zone controlled electric heating and energy monitoring equipment. |
JOB: | Halberry Lodge – Isle of Wight |
CLIENT: | D M Habens |
DESCRIPTION: | A facility that aims to combine information, education, social and therapeutic activity for those suffering from or affected by life-limiting illness. The installation consisted of the following mains distribution including sub-mains, general power and supplies to air conditioning units etc. An addressable fire alarm and nurse call system. Control of the lighting is via a Lutron dimmable control panel with local dimmer control panels providing lighting levels to suit the requirements of the hospice. |
JOB: | Whitegates |
CLIENT: | Nolan Davis |
DESCRIPTION: | A new care home facility in Liss. This was a complete electrical installation including an addressable fire alarm system, CAT 6 network system, Telecare Assist and lightning protection. |